BR Steel & Power plant yard — twin chimneys, conveyor galleries and kiln structures, with hard-hatted workers crossing beside an iron-ore stockpile.

About Us · BR Steel & Power Pvt. Ltd.

Built on Strength. Driven by Progress.

Founded in 2019 and entering a new phase of growth in 2021, BR Steel & Power operates across 165 acres in India’s eastern mineral belt, supported by 1,000+ people and a closed-loop integrated steel and power ecosystem. Built on reliable manufacturing, operational excellence and responsible growth, we are strengthening India’s industrial future from Odisha.

Company Overview

Established 2019 · Group acquisition 2021

0+

Combined steel output, TPA. Sponge iron + MS billets, integrated under one roof in Sambalpur, Odisha.

0TPA

Sponge Iron

0MW

Captive Power

0TPA

MS Billets

0.0MTPA

Phase 2 Target

Driving India's Growth, One Ton At A Time.

From Sambalpur — in the heart of India's eastern steel belt — we forge the materials the country builds with.

BR Steel & Power Pvt. Ltd. is an integrated steel and power producer incorporated in 2019 and acquired in 2021 by a diversified industrial group of Odisha and Chhattisgarh, with flagship operations spanning steel and power, ceramics, and chemicals.

Our 165-acre facility houses a closed-loop integrated operation that takes iron ore through to finished MS billets, powered by a 20 MW captive plant that recovers waste heat from our own DRI kiln. Operations are rail, road and air connected, and surface water is drawn from Hirakud Dam's Power Channel Pond-II.

The company employs over 1,000 people — most from Sambalpur and adjacent communities — and supplies sponge iron, MS billets and captive power to leading rolling mills, TMT manufacturers, infrastructure EPCs, and industrial buyers across India.

We're not the loudest name in Indian steel. We aim to be one of the most reliable.

Vision & Mission

Where it goes

The sectors building a stronger India

From the rolling mills supplying the country's TMT bars to the EPCs shaping its skyline — our steel sits inside the work that matters.

Aerial view of the BR Steel integrated plant at sunrise.

Our Vision

To Be a Trusted Name in Integrated Steel & Power.

To build long-term value through reliable manufacturing, consistent quality and responsible growth, while strengthening our capabilities for the future.

  • Consistent quality and dependable performance
  • Efficient and integrated operations
  • Sustainable growth for customers, people and communities​

Leadership

Rajesh Agrawal, Director

Rajesh Agrawal

Director

Anil Kedia, Director

Anil Kedia

Director

Deepak Agrawal, Director

Deepak Agrawal

Director

Sameer Agrawal, Director

Sameer Agrawal

Director

Core Values

The principles

Four principles that shape every shift

01

Integration

Iron ore to finished billets, energy generation to consumption, vertical integration as foundation.

02

Discipline

Same product, same way, every time. Processes don't change with demand cycles.

03

Reliability

We supply, we don't sell. Built for customers thinking three years out.

04

Sustainability

WHRB-led power, Hirakud water, local employment — designed into cost structure.

Sustainability & Responsibility

Established 2019 · Group acquisition 2021

Responsibility Is Not Just A Role, It's A Commitment

Safety, environmental protection, community development and quality systems — built into every step of our operations, every shift, every supplier relationship.

Safety briefing with workers in hard hats on site

01

Occupational Safety

Zero injuries · Integrated HSE

Waste-heat recovery boiler plant at dusk

02

Environmental Protection

52 TPH WHRB · Hirakud water

Senior engineer mentoring a worker in the plant

03

Community & People

1,000+ employed locally

Quality manager reviewing certification documents

04

Quality Systems

ISO 9001 · 14001 · 45001

Capacity & Expansion

Built to scale

The Numbers Behind The Commitment

Current capacity places us among the dependable mid-tier integrated producers of the eastern steel belt. Phase 2 is engineered to scale without breaking the closed-loop model.

Sponge Iron

Solid-state reduction

Capacity

1,50,000TPA

Equipment

1 × 500 TPD Rotary DRI Kiln

Active

MS Billets

Continuous casting

Capacity

1,08,000TPA

Equipment

4 × 12 MT IF · 20 TPH LRF · 1 × CCM

Active

Captive Power

WHRB + AFBC

Capacity

20MW

Equipment

52 TPH WHRB + 40 TPH AFBC → 20 MW TG

Active

Phase 2 · Expansion programme

A 4× Expansion Vision

Sufficient land in place at our 165-acre facility for an integrated 0.6 million TPA plant — four times current sponge output. Alongside a structural rolling mill and additional captive generation, with closed-loop integration preserved at every scale.

Phase 2 target

0.6 MTPA integrated plant

Quality Commitment

The standard

Quality Is A System, Not A Check

“Every heat. Every billet. Every shipment. No exceptions.”

ISO 9001:2015
ISO 14001
ISO 45001
  • 01Spectrometer chemical testing
    Per heat
  • 02Dimensional verification
    Pre-dispatch
  • 03Sulphur print testing
    Continuous
  • 04Bend & mechanical testing
    Sample lots
  • 05100% traceability
    End-to-end